Description
hardware flow control. It is an ideal choice in the field of industrial automation.
ABB completed commissioning of Maritime Link and officially delivered the power interconnection project
ABB has completed the commissioning of Maritime Link and officially handed over the power interconnection
project to Emera, a leading energy and services company headquartered in Eastern Canada.
The MariTIme Link power interconnection made history on December 8, 2017, with the first power exchange
between Newfoundland and Nova Scotia. It entered service on January 15, 2018, as ABB continues to work
with Emera and the provincial system operators during initial operations.
The Maritime Link is a 500-megawatt high-voltage direct current link that enables clean, renewable energy
produced in Newfoundland and Labrador to
be transmitted to Nova Scotia”s North American grid, reducing reliance on fossil fuels. The robust nature of
ABB”s solution will also enable Nova Scotia to integrate other renewable energy sources, such as wind energy,
and contribute to Canada”s emissions reduction efforts.
ABB officially delivers MariTIme Link power interconnection project
The lightweight HVDC technology used in the Maritime Link design is the world”s first bipolar
configuration using proven and reliable voltage source converters. This solution enhances system availability,
reduces losses and improves grid reliability, allowing power to continue to be transmitted even when a
conductor or converter is not in use. The converter station is equipped with an
advanced MACH control and protection system based on ABB Ability, which functions like the brain of the
high-voltage DC connection, monitoring, controlling and protecting cutting-edge technologies within the station,
and managing thousands of operations to ensure power reliability.
Its advanced fault levels and remote control capabilities also help protect against unexpected outages such as
lightning strikes.
“Our proven lightweight HVDC technology will enable the historic Maritime Link power interconnection
project to integrate and deliver clean renewable energy while enhancing grid stability and enabling power
sharing.” Patrick Fragman, head of ABB”s grid integration business “HVDC is a technology we have pioneered
and led and is an important part of the next phase of our strategy,
cementing our position as the partner of choice for a stronger, smarter and greener grid,” said the company.
In addition to two converter stations for ±200 kV HVDC transmission, the project scope includes two 230 kV
AC substations in Newfoundland, a 345 kV AC substation and two cables in Nova Scotia Transit station.
https://www.xmamazon.com
https://www.xmamazon.com
https://www.plcdcs.com/
www.module-plc.com/
https://www.ymgk.com
METSO IOP304
METSO IOP320
METSO IOP331
METSO IOP341
METSO IOP345
METSO IOP353 181220
METSO IOP353
METSO IOT300A
METSO PDP401
METSO PDP403
METSO PDP601
METSO R/I-TB 9139041
METSO S420061
METSO S420071
METSO S420154
METSO S422737
GE IC75VGI06MTD-LH
GE IC75VSI12CTD-DD
GE IC754CSL12CTDEC
GE IC754CSL12CTD
GE IC754CSX06CTD
GE IC752SPL013
GE VMICPCI-7806-223000 Intel Pentium M/Celeron M Universal CompactPCI Single Board Computer
GE Microprocessor VMICPCI-7806-21100/350-657806-21100 D
GE VMICPCI-7806-211000 Remote Ethernet Boot CPU Module
GE microprocessor board VMICPCI-7806-211000 350-657806-211000L
ABB UMB015BE02 HIEE400995R0002
ABB UMB015BE HIEE40110R0002
ABB UMB015BE02 HIEE40110R0002
ABB UMB015BE HIEE400995R0002
HIEE40110R0002-MODIFICATION-UM B015 BE
HIEE400995R0002-3004223/010-UMB015BE02
HIEE400995R0002-3004223/010-UM B015 BE02+HIEE40110R0002-MODIFICATION-UM B015 BE
ABB UAA326A04
ABB HIEE300024R4
ABB HIEE300024R4 UAA326A04
ABB HIEE300024R2
ABB UAA326A02
ABB UAA326A02 HIEE300024R2
ABB HIEE300744R1
ABB UAC318AE
ABB UAC318AE HIEE300744R1
ABB HIEE401481R0001
ABB UAC326AE
ABB UAC326AE HIEE401481R0001
ABB HIEE300890R0001
ABB UAC383AE01
ABB UAC383AE01 HIEE300890R0001
ABB HIEE300888R0001
ABB UAC389AE01
ABB UAC389AE01 HIEE300888R0001
ABB 3BHE012551R0001
ABB UAD142A01
Reviews
There are no reviews yet.