Description
hardware flow control. It is an ideal choice in the field of industrial automation.
[Introduction] China”s industrial robots started in the early 1970s. After more than 20 years of
development, they have roughly gone through three stages: the embryonic period in the 1970s
, the development period in the 1980s, and the applicability period in the 1990s.
In recent years, the global robot industry has entered a stage of rapid development. In fields such as
catering, public services, logistics and transportation, more and more robots are involved. At the same
time, the research and development process of commercial robots is also accelerating. In particular, the
outbreak of the COVID-19 epidemic has promoted the rapid development of robot applications.
China”s industrial robots started in the early 1970s. After more than 20 years of development, they have
roughly gone through three stages: the embryonic period in the 1970s, the development period in the
1980s, and the applicability period in the 1990s.
The 1970s was a milestone in the development of world science and technology: humans landed on the
moon and achieved soft landings on Venus and Mars. Our country has also launched artificial satellites.
The application of industrial robots has set off a climax in the world, especially in Japan, which is developing
more rapidly. It supplements the increasingly scarce labor force. Against this background, my country began to
develop its own industrial robots in 1972.
After entering the 1980s, under the impact of the high-tech wave and with the deepening of reform and opening up,
the development and research of robotics technology in our country received government attention and support. During
the “Seventh Five-Year Plan” period, the state invested funds to research industrial robots and their parts, completed the
development of
a complete set of teaching and reproducible industrial robot technologies, and developed spraying, spot welding, arc
welding and handling robots. In 1986, the National High-tech Research and Development Plan (863 Plan) was implemented.
The theme of intelligent robots followed the forefront
of world robotics technology. After several years of research, a large number of scientific research results were achieved and
a number of special robots were successfully developed.
https://www.xmamazon.com
https://www.xmamazon.com
https://www.plcdcs.com/
www.module-plc.com/
https://www.ymgk.com
KONGSBERG MP7600CP
KONGSBERG NA1E221.2 6200093
KONGSBERG MARITIME ASPCB NA1008.3
KONGSBERG MARITIME ASRDI-32X1
KONGSBERG MARITIME RAO-8X1
KONGSBERG RDI-32 8100154 REVF
KONGSBERG ENGINE TELEGRAF UNITHA334972C ETU003
KONGSBERG MARITIME RSER200-4 REV 1.0.3
KONGSBERG GLB-7B/7A-SPAREB
KONGSBERG AUE-1065 RDO-16 HA451675B
KONGSBERG ETU 002SW56002-A5
KONGSBERG NORCONTROL RD0-16X1
KONGSBERG MARITIME RDI-32
KONGSBERG RCU500
KONGSBERG WCC600
KONGSBERG C2XE
KONGSBERG MSI-CL
KONGSBERG RAI-16XE
KONGSBERG RDO-16XE
KONGSBERG NOR CONTROL HA51994A
KONGSBERG RMP400 603129REVD1
KONGSBERG NORCONTROL HA451672A RAO-8
KONGSBERG EX AL-100B/RPEX
KONGSBERG NLC-2B/95
KONGSBERG AUTRONICA EAC-300/M
KONGSBERG MARITIME NA-1E220
KONGSBERG MARITIME 8100261 WCU
KONGSBERG GLL-90A
KONGSBERG GLK-90B
KONGSBERG PSU-48V
KONGSBERG NORCONTROL NA1120
KONGSBERG SIMRAD AI400 37970092
KONGSBERG SSU8810
KONGSBERG NORCONTROL GCU 8810
KONGSBERG OPU8810
KONGSBERG GLR-92A 7258-004
KONGSBERG A102-02
KONGSBERG AIS200
KONGSBERG SIMRAD SBC 500
KONGSBERG SIMRAD ALBATROSS AOV-406
KONGSBERG MARITIME AS RMP200-8 REV
KONGSBERG VT25-373-99/X9
KONGSBERG EAC-300 7252-087.0002
KONGSBERG RCU501 603439
KONGSBERG MARITIME 603201 REV B CJOY
KONGSBERG AUTOCHIEF C20
KONGSBERG MARITIME RSER200-4 REV
KONGSBERG MRUD MRU-M-SC1
KONGSBERG MARITIME RHUB200-5 REV
KONGSBERG MARITIME RMP200-8 REV
KONGSBERG OMC139
KONGSBERG ISIC MD 22 TN
KONGSBERG NORCONTROL ETU ETU 001
KONGSBERG GA110/A
KONGSBERG SIMRAD AOV-406 37982675A
Reviews
There are no reviews yet.